NTPC, Barauni Or Barauni Thermal Power Station is an existing 720 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Barauni Thermal Power Station (en)
|
rdfs:comment
| - NTPC, Barauni Or Barauni Thermal Power Station is an existing 720 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
th fuel primary
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
location
| |
operator
| |
owner
| - Government of India, (en)
|
status
| |
commissioned
| |
georss:point
| |
has abstract
| - NTPC, Barauni Or Barauni Thermal Power Station is an existing 720 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. East Central Railway will provide uninterrupted supply of coal to thermal power station. NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018. The units of Barauni power station will be progressively put under commercial operation. On 27 November 2021, Bihar CM Nitish Kumar inaugurated 250 Megawatts Powerhouse Unit in Barauni Thermal Power Station. (en)
|
name official
| |
ps electrical capacity
| |
ps units operational
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening date
| |
opening year
| |
status
| |
installed capacity (W)
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(86.024002075195 25.392000198364)
|
is Link from a Wikipage to another Wikipage
of | |