The Follo Line (Norwegian: Follobanen) is a 22.5-kilometer (14.0 mi) high-speed railway under construction between Oslo and Ski, Norway. Running parallel to the Østfold Line, it will be engineered for 250 km/h (160 mph). Terminal stations will be Oslo Central Station and Ski Station. Most of the line, 19 kilometres (12 mi), will be in a twin-tube tunnel named the Blix Tunnel, which will be the longest railway tunnel in the country. Construction started in 2014, and is scheduled to be open in 11 December 2022. The Follo Line will increase capacity from twelve to forty trains per hour along the South Corridor, and will allow express and regional trains to decrease travel time from Ski to Oslo from 22 to 11 minutes. The line was prospected to cost over 26 billion Norwegian krone (NOK) in 2014

AttributesValues
rdf:type
rdfs:label
  • Follo Line (en)
  • Línea Follo (es)
  • Spoorlijn Oslo - Ski (nl)
  • Follobanen (pl)
  • Follobanen (sv)
rdfs:comment
  • De spoorlijn tussen Oslo en Ski ook wel Follobanen genoemd is een Noorse hogesnelheidsspoorlijn tussen de hoofdstad Oslo en de plaats Ski, provincie Akershus. (nl)
  • Follobanen - planowana linia kolejowa o długości 22,5 km kolei dużych prędkości pomiędzy Oslo i Ski, w Norwegii. Będzie biegła równolegle do Østfoldbanen i jest zaprojektowana do obsługi pociągów z prędkością 200 km/h. Stacjami krańcowymi będą Oslo Sentralstasjon i Ski. Większość linii zostanie wybudowana w tunelu. Budowę planuje się rozpocząć w 2013, a oddanie do ruchu w 2018. Follobanen zwiększy przepustowość w korytarzu południowym z 20 do 40 pociągów na godzinę, i pozwoli na skrócenie czasu podróży pociągów ekspresowych i regionalnych z Oslo do Ski z 22 do 11 minut. Przewidywany koszt budowy linii to 11 mld NOK. (pl)
  • Follobanen är en ny järnväg i Norge mellan Oslo och Ski. Follobanen är Norges hittills största infrastrukturprojekt i modern tid. Banan är dubbelspårig och byggd för 250 km/h och utgör, tillsammans med den äldre Østfoldbanen, en fyrspårssträcka mellan Oslo och Ski. Banan har en längd på 22 kilometer inkluderat Norges (och Nordens) längsta järnvägstunnel på 19,5 kilometer, mer än dubbelt så lång som Sveriges längsta järnvägstunnel, Hallandsåstunneln, på 8,7 kilometer. Bygget startade år 2014 och banan öppnades i slutet av 2022. Kostnaden blev cirka 36,8 miljarder norska kronor. (sv)
  • The Follo Line (Norwegian: Follobanen) is a 22.5-kilometer (14.0 mi) high-speed railway under construction between Oslo and Ski, Norway. Running parallel to the Østfold Line, it will be engineered for 250 km/h (160 mph). Terminal stations will be Oslo Central Station and Ski Station. Most of the line, 19 kilometres (12 mi), will be in a twin-tube tunnel named the Blix Tunnel, which will be the longest railway tunnel in the country. Construction started in 2014, and is scheduled to be open in 11 December 2022. The Follo Line will increase capacity from twelve to forty trains per hour along the South Corridor, and will allow express and regional trains to decrease travel time from Ski to Oslo from 22 to 11 minutes. The line was prospected to cost over 26 billion Norwegian krone (NOK) in 2014 (en)
foaf:name
  • Follo Line (en)
name
  • Follo Line (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Follobanen.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/NSB_type_69_ved_Ski_stasjon_TRS_070804_022.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software