The Panda Patriot Power Plant is a natural gas-fired power station located in Clinton Township, Lycoming County, Pennsylvania (near Williamsport). It went commercial in July 2016 and construction on the project began in 2013. It is owned solely by Panda Energy International of Dallas, Texas. The plant was built due to the retirement of about a dozen coal-fired power stations in Pennsylvania, New York and Maryland. After three years of planning and approval by local, state and federal agencies the station construction began in 2013 and took approximately 30 months to complete the total project.

Property Value
dbo:abstract
  • The Panda Patriot Power Plant is a natural gas-fired power station located in Clinton Township, Lycoming County, Pennsylvania (near Williamsport). It went commercial in July 2016 and construction on the project began in 2013. It is owned solely by Panda Energy International of Dallas, Texas. The plant was built due to the retirement of about a dozen coal-fired power stations in Pennsylvania, New York and Maryland. After three years of planning and approval by local, state and federal agencies the station construction began in 2013 and took approximately 30 months to complete the total project. (en)
dbo:buildingStartDate
  • December 2013
dbo:buildingStartYear
  • 2013-01-01 (xsd:gYear)
dbo:installedCapacity
  • 829000000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 0003-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageID
  • 55165371 (xsd:integer)
dbo:wikiPageLength
  • 4866 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1025144844 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 3 (xsd:integer)
dbp:constructionBegan
  • December 2013 (en)
dbp:cost
  • 9.09E8
dbp:country
  • United States (en)
dbp:imageCaption
  • Panda Patriot Power Plant in May 2021 (en)
dbp:location
dbp:locationMapCaption
  • Location of Panda Patriot Power Plant (en)
dbp:name
  • Panda Patriot Power Plant (en)
dbp:operator
  • Panda Energy International (en)
dbp:owner
dbp:psElectricalCapacity
  • 829.0
dbp:psUnitsOperational
  • 2 (xsd:integer)
dbp:status
  • O (en)
dbp:thFuelPrimary
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 41.1807 -76.8393
rdf:type
rdfs:comment
  • The Panda Patriot Power Plant is a natural gas-fired power station located in Clinton Township, Lycoming County, Pennsylvania (near Williamsport). It went commercial in July 2016 and construction on the project began in 2013. It is owned solely by Panda Energy International of Dallas, Texas. The plant was built due to the retirement of about a dozen coal-fired power stations in Pennsylvania, New York and Maryland. After three years of planning and approval by local, state and federal agencies the station construction began in 2013 and took approximately 30 months to complete the total project. (en)
rdfs:label
  • Panda Patriot Power Plant (en)
owl:sameAs
geo:geometry
  • POINT(-76.839302062988 41.180698394775)
geo:lat
  • 41.180698 (xsd:float)
geo:long
  • -76.839302 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Panda Patriot Power Plant (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License