About: Sanying line     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.org:8891 associated with source document(s)
QRcode icon
http://dbpedia.org:8891/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSanying_line

The Sanying or Light Blue line (Chinese: 三鶯線) (code LB) is a light metro line under construction in New Taipei, Taiwan. Approval for the construction of the line was given by the central government on 2 June 2015. Constructed on elevated tracks, the line will be 14.3 km long and will have 12 stations and one depot. It will run from Dingpu Station on the Bannan line along Zhongyang Road to Sanxia and then cross National Freeway No. 3 to Yingge. A turnkey contract was signed with Hitachi Rail STS and Hitachi Rail Italy as members of the ARH consortium on 21 June 2016. As leader of the consortium, Hitachi Rail STS's scope of work included the supply of train control technology and all the electromechanical systems for an equivalent value of €219.8 million (VAT excluded). Hitachi's scope of wo

AttributesValues
rdf:type
rdfs:label
  • Sanying line (en)
  • 新北捷運三鶯線 (ja)
  • 三鶯線 (zh)
rdfs:comment
  • 三鶯線(さんおうせん、正体字: 三鶯線、サンインシェン、英文表記: Sanyin Line)は台湾新北市土城区の頂埔駅と同市の三峡区・鶯歌区を結ぶ計画中の捷運路線。路線総延長は14.29km。 (ja)
  • 三峽鶯歌捷運線,簡稱三鶯線,是中華民國一條興建中的新北捷運中運量路線。雛型最早於2000年提出,採用全高架型式建置,路線行經新北市土城區、三峽區、鶯歌區。主體工程已經於2016年7月21日開始施工,預估將於2024年底完工。除主線外,三鶯線還規畫延伸至桃園市八德區,與桃園捷運綠線銜接。 (zh)
  • The Sanying or Light Blue line (Chinese: 三鶯線) (code LB) is a light metro line under construction in New Taipei, Taiwan. Approval for the construction of the line was given by the central government on 2 June 2015. Constructed on elevated tracks, the line will be 14.3 km long and will have 12 stations and one depot. It will run from Dingpu Station on the Bannan line along Zhongyang Road to Sanxia and then cross National Freeway No. 3 to Yingge. A turnkey contract was signed with Hitachi Rail STS and Hitachi Rail Italy as members of the ARH consortium on 21 June 2016. As leader of the consortium, Hitachi Rail STS's scope of work included the supply of train control technology and all the electromechanical systems for an equivalent value of €219.8 million (VAT excluded). Hitachi's scope of wo (en)
foaf:name
  • Sanying line (en)
name
  • Sanying line (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/New_Taipei_Metro_Line_LB.svg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
stock
tp
  • Sānyīng-Siàn (en)
dbp:wikiPageUsesTemplate
thumbnail
caption
  • Station simulation (en)
end
  • Yingtao Fude (en)
locale
  • Taiwan
  • New Taipei and Taoyuan , (en)
logo
  • New Taipei Metro Line LB.svg (en)
logo width
map state
  • collapsed (en)
native name
  • (en)
open
operator
other name
  • Light Blue line (en)
p
  • Sānyīng xiàn (en)
poj
  • Saⁿ-Eng-Sòaⁿ (en)
s
  • 三莺线 (en)
start
status
  • Under construction (en)
system
t
  • 三鶯線 (en)
Tracks
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 45 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software