In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods.
Attributes | Values |
---|
rdfs:label
| - リソース (プロジェクト管理) (ja)
- Resource (project management) (en)
|
rdfs:comment
| - リソース (英: resource)は、プロジェクト管理では人、設備、施設、資金、およびその他プロジェクト活動の完了に必要な資源(通常は労働以外)のことを指す。 プロジェクト管理では、プロジェクトタスクを実行するためのリソースが必要となる。したがって、リソースの不足は、プロジェクト活動の制約となる。リソースは備蓄可能なものとそうでないものがある。備蓄可能なリソースは、使い果たされない限り利用可能なままであり、それらを生成するプロジェクトタスクによって補充することができるが、備蓄できないリソースは、前の期間に使用されていなくても、期間ごとに調達する必要がある。 リソースのスケジューリング、利用可能性、最適化は、プロジェクト管理を成功させるための鍵と見なされる。 リソースは、各プロジェクト活動に与えられた優先順位に基づいて限定的に割り当てられる。優先度は、クリティカルパス法とヒューリスティック分析を使用して計算される。 リソースの数に制約がある場合は、可能な限り最も効率的なスケジュールを作成する必要がある。つまり、プロジェクトの期間を最小限に抑え、利用可能なリソースを最大限に活用することである。 (ja)
- In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods. (en)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods. Resource scheduling, availability and optimisation are considered key to successful project management. Allocation of limited resources is based on the priority given to each of the project activities. Their priority is calculated using the Critical path method and heuristic analysis.For a case with a constraint on the number of resources, the objective is to create the most efficient schedule possible - minimising project duration and maximising the use of the resources available. (en)
- リソース (英: resource)は、プロジェクト管理では人、設備、施設、資金、およびその他プロジェクト活動の完了に必要な資源(通常は労働以外)のことを指す。 プロジェクト管理では、プロジェクトタスクを実行するためのリソースが必要となる。したがって、リソースの不足は、プロジェクト活動の制約となる。リソースは備蓄可能なものとそうでないものがある。備蓄可能なリソースは、使い果たされない限り利用可能なままであり、それらを生成するプロジェクトタスクによって補充することができるが、備蓄できないリソースは、前の期間に使用されていなくても、期間ごとに調達する必要がある。 リソースのスケジューリング、利用可能性、最適化は、プロジェクト管理を成功させるための鍵と見なされる。 リソースは、各プロジェクト活動に与えられた優先順位に基づいて限定的に割り当てられる。優先度は、クリティカルパス法とヒューリスティック分析を使用して計算される。 リソースの数に制約がある場合は、可能な限り最も効率的なスケジュールを作成する必要がある。つまり、プロジェクトの期間を最小限に抑え、利用可能なリソースを最大限に活用することである。 (ja)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |