The Baoji–Zhongwei railway is a railway line in northwest China: it starts in Baoji in Shaanxi, passes through Pingliang in Gansu and finally ends in Zhenluobao (镇罗堡) in Zhongwei in Ningxia, with a total length of 498.19 kilometres. Construction on the railway started in 1990 and track laying was completed on 10 July 1994. It was electrified and opened in the following year on 8 June 1995. The railway is under the jurisdiction of the Xi'an Railway Bureau in Shaanxi and the Lanzhou Railway Bureau in Gansu and Ningxia. The line is single-track and electrified. It is a key line connecting Shaanxi, Gansu and Ningxia.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Baoji–Zhongwei railway (en)
- 宝中線 (ja)
- 宝中铁路 (zh)
|
rdfs:comment
| - 宝中線(ほうちゅうせん)は陝西省宝鶏市から甘粛省平涼市を経て寧夏回族自治区中衛市を結ぶ中国国鉄の鉄道路線である。陝西、甘粛、寧夏を結ぶ幹線である。 (ja)
- 宝中铁路是中國西北的一條鐵路線:东南边的起点是陕西省的宝鸡,经过甘肃省平凉市,最後后西北边的终点是宁夏回族自治区中卫市的镇罗堡,全长498.19公里。該鐵路1990年開始興建,1996年開始通車營運。其中在陕西境内归中国铁路西安局集团管辖,在甘肃和宁夏境内归中国铁路兰州局集团管辖。宝中铁路为单线电气化铁路,途径中卫,同心,固原,平凉,华亭,陇县,千阳,宝鸡。是连接陕西,甘肃,宁夏的咽喉要道。 (zh)
- The Baoji–Zhongwei railway is a railway line in northwest China: it starts in Baoji in Shaanxi, passes through Pingliang in Gansu and finally ends in Zhenluobao (镇罗堡) in Zhongwei in Ningxia, with a total length of 498.19 kilometres. Construction on the railway started in 1990 and track laying was completed on 10 July 1994. It was electrified and opened in the following year on 8 June 1995. The railway is under the jurisdiction of the Xi'an Railway Bureau in Shaanxi and the Lanzhou Railway Bureau in Gansu and Ningxia. The line is single-track and electrified. It is a key line connecting Shaanxi, Gansu and Ningxia. (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
caption
| |
native name
| |
native name lang
| |
open
| |
has abstract
| - The Baoji–Zhongwei railway is a railway line in northwest China: it starts in Baoji in Shaanxi, passes through Pingliang in Gansu and finally ends in Zhenluobao (镇罗堡) in Zhongwei in Ningxia, with a total length of 498.19 kilometres. Construction on the railway started in 1990 and track laying was completed on 10 July 1994. It was electrified and opened in the following year on 8 June 1995. The railway is under the jurisdiction of the Xi'an Railway Bureau in Shaanxi and the Lanzhou Railway Bureau in Gansu and Ningxia. The line is single-track and electrified. It is a key line connecting Shaanxi, Gansu and Ningxia. There are plans to make the line double-tracked and increase the maximum speed to 160 km/h. (en)
- 宝中線(ほうちゅうせん)は陝西省宝鶏市から甘粛省平涼市を経て寧夏回族自治区中衛市を結ぶ中国国鉄の鉄道路線である。陝西、甘粛、寧夏を結ぶ幹線である。 (ja)
- 宝中铁路是中國西北的一條鐵路線:东南边的起点是陕西省的宝鸡,经过甘肃省平凉市,最後后西北边的终点是宁夏回族自治区中卫市的镇罗堡,全长498.19公里。該鐵路1990年開始興建,1996年開始通車營運。其中在陕西境内归中国铁路西安局集团管辖,在甘肃和宁夏境内归中国铁路兰州局集团管辖。宝中铁路为单线电气化铁路,途径中卫,同心,固原,平凉,华亭,陇县,千阳,宝鸡。是连接陕西,甘肃,宁夏的咽喉要道。 (zh)
|
linelength km
| |
line length (μ)
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening date
| |
opening year
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is lines
of | |
is serving railway line
of | |
is foaf:primaryTopic
of | |