About: Aksu Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatProposedHydroelectricPowerStations, within Data Space : dbpedia.org:8891 associated with source document(s)
QRcode icon
http://dbpedia.org:8891/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FAksu_Dam

The Aksu Dam, sometimes referred to as Aksu-Anakol Dam, is a hydropower dam in the preliminary stages of construction near the town of Aksu on the Çoruh River in Erzurum Province, Turkey. It will have an installed capacity of 160 MW. The 114 m high embankment dam is part of the Çoruh Development Plan, a 17-dam-cascade hydropower scheme designed to tap Çoruh River's hydropower potential. Aksu Dam will be located immediately upstream Arkun Dam (237 MW), and immediately downstream Güllübağ Dam (96 MW), both of which are already operational.

AttributesValues
rdf:type
rdfs:label
  • Aksu Dam (en)
rdfs:comment
  • The Aksu Dam, sometimes referred to as Aksu-Anakol Dam, is a hydropower dam in the preliminary stages of construction near the town of Aksu on the Çoruh River in Erzurum Province, Turkey. It will have an installed capacity of 160 MW. The 114 m high embankment dam is part of the Çoruh Development Plan, a 17-dam-cascade hydropower scheme designed to tap Çoruh River's hydropower potential. Aksu Dam will be located immediately upstream Arkun Dam (237 MW), and immediately downstream Güllübağ Dam (96 MW), both of which are already operational. (en)
foaf:name
  • Aksu Baraji ve HES (en)
  • Aksu Dam (en)
name
  • Aksu Dam (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
spillway type
  • Controlled chute, six radial gates (en)
dbp:wikiPageUsesTemplate
country
location
  • Aksu, Erzurum Province (en)
location map
  • Turkey (en)
owner
purpose
  • Power (en)
status
  • Preliminary construction (en)
georss:point
  • 40.60138888888889 41.15694444444444
has abstract
  • The Aksu Dam, sometimes referred to as Aksu-Anakol Dam, is a hydropower dam in the preliminary stages of construction near the town of Aksu on the Çoruh River in Erzurum Province, Turkey. It will have an installed capacity of 160 MW. The 114 m high embankment dam is part of the Çoruh Development Plan, a 17-dam-cascade hydropower scheme designed to tap Çoruh River's hydropower potential. Aksu Dam will be located immediately upstream Arkun Dam (237 MW), and immediately downstream Güllübağ Dam (96 MW), both of which are already operational. It is expected to generate an average 382.5 GWh of electric power annually, which will contribute to 3.78% of Çoruh basin' hydropower generation and 0.54% of Turkey's. Its construction is supervised by Turkey's State Hydraulic Works. Construction on access roads and diversion tunnels began in 2010. (en)
dam crosses
dam type
  • Embankment, rock-fill (en)
name official
  • Aksu Baraji ve HES (en)
plant annual gen
plant capacity
plant turbines
vastest lake
part
river
gold:hypernym
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
description
  • Embankment, rock-fill (en)
elevation (μ)
length (μ)
purpose
  • Power
status
  • Preliminary construction
volume (μ³)
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 34 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software