This HTML5 document contains 28 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dctermshttp://purl.org/dc/terms/
yago-reshttp://yago-knowledge.org/resource/
dbohttp://dbpedia.org/ontology/
foafhttp://xmlns.com/foaf/0.1/
geohttp://www.w3.org/2003/01/geo/wgs84_pos#
n17https://global.dbpedia.org/id/
dbthttp://dbpedia.org/resource/Template:
rdfshttp://www.w3.org/2000/01/rdf-schema#
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
wikipedia-enhttp://en.wikipedia.org/wiki/
dbphttp://dbpedia.org/property/
dbchttp://dbpedia.org/resource/Category:
provhttp://www.w3.org/ns/prov#
xsdhhttp://www.w3.org/2001/XMLSchema#
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/
georsshttp://www.georss.org/georss/

Statements

Subject Item
dbr:Fort_Point_Channel
dbo:wikiPageWikiLink
dbr:Fort_Point_Channel_tunnel
Subject Item
dbr:Fort_Point_Channel_tunnel
rdf:type
geo:SpatialThing
rdfs:label
Fort Point Channel tunnel
rdfs:comment
The Fort Point Channel Tunnel is a tunnel underneath the South Boston Streets and Fort Point Channel. It was built using a casting basin. It was built 1991–1994 in the Big Dig. In July 2006, a ceiling tile and associated debris weighing 26 tons collapsed, causing the death of a passenger in a vehicle in the tunnel and severe injury to the driver. This incident and the resulting inspections and repairs delayed the Big Dig construction project by a year.
geo:lat
42.34700012207031
geo:long
-71.05400085449219
dcterms:subject
dbc:Tunnels_in_Boston
dbo:wikiPageID
50227708
dbo:wikiPageRevisionID
1119941788
dbo:wikiPageWikiLink
dbr:Big_Dig dbr:Fort_Point_Channel dbc:Tunnels_in_Boston dbr:Big_Dig_ceiling_collapse
owl:sameAs
yago-res:Fort_Point_Channel_tunnel wikidata:Q25005781 n17:2MZZS
dbp:wikiPageUsesTemplate
dbt:Reflist dbt:Coord dbt:US-tunnel-stub
georss:point
42.347 -71.054
dbo:abstract
The Fort Point Channel Tunnel is a tunnel underneath the South Boston Streets and Fort Point Channel. It was built using a casting basin. It was built 1991–1994 in the Big Dig. In July 2006, a ceiling tile and associated debris weighing 26 tons collapsed, causing the death of a passenger in a vehicle in the tunnel and severe injury to the driver. This incident and the resulting inspections and repairs delayed the Big Dig construction project by a year.
prov:wasDerivedFrom
wikipedia-en:Fort_Point_Channel_tunnel?oldid=1119941788&ns=0
dbo:wikiPageLength
1013
foaf:isPrimaryTopicOf
wikipedia-en:Fort_Point_Channel_tunnel
geo:geometry
POINT(-71.054000854492 42.34700012207)
Subject Item
dbr:Fort_Point_Tunnel
dbo:wikiPageWikiLink
dbr:Fort_Point_Channel_tunnel
dbo:wikiPageRedirects
dbr:Fort_Point_Channel_tunnel
Subject Item
wikipedia-en:Fort_Point_Channel_tunnel
foaf:primaryTopic
dbr:Fort_Point_Channel_tunnel