About: Wachusett Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Wachusett Dam in Clinton, Massachusetts, impounds the Nashua River, creating the Wachusett Reservoir. Construction started in 1897 and was completed in 1905. It is part of the Nashua River Watershed. This dam is part of greater Boston's water system, maintained and controlled by the Massachusetts Water Resources Authority (MWRA). Its discharge is into the Nashua River. When it was completed in 1905, the Wachusett Reservoir was the largest public water supply reservoir in the world. At that time, the Wachusett Reservoir Dam was the largest gravity dam in the world as well.

Property Value
dbo:Infrastructure/length
  • 0.294132
dbo:abstract
  • The Wachusett Dam in Clinton, Massachusetts, impounds the Nashua River, creating the Wachusett Reservoir. Construction started in 1897 and was completed in 1905. It is part of the Nashua River Watershed. This dam is part of greater Boston's water system, maintained and controlled by the Massachusetts Water Resources Authority (MWRA). Its discharge is into the Nashua River. When it was completed in 1905, the Wachusett Reservoir was the largest public water supply reservoir in the world. At that time, the Wachusett Reservoir Dam was the largest gravity dam in the world as well. (en)
dbo:buildingStartYear
  • 1897-01-01 (xsd:gYear)
dbo:height
  • 62.484000 (xsd:double)
dbo:lake
dbo:length
  • 294.132000 (xsd:double)
dbo:location
dbo:openingYear
  • 1905-01-01 (xsd:gYear)
dbo:operator
dbo:part
dbo:river
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 2607801 (xsd:integer)
dbo:wikiPageLength
  • 4699 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1070134817 (xsd:integer)
dbo:wikiPageWikiLink
dbp:damCrosses
dbp:extra
  • 0001-01-18 (xsd:gMonthDay)
dbp:id
  • 20001117 (xsd:integer)
dbp:imageCaption
  • Wachusett Dam at Clinton (en)
dbp:location
dbp:name
  • Wachusett Dam (en)
dbp:nameOfficial
  • Wachusett Reservoir Dam (en)
dbp:operator
dbp:resName
dbp:title
  • Wachusett Dam (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 42.40361111111111 -71.68777777777778
rdf:type
rdfs:comment
  • The Wachusett Dam in Clinton, Massachusetts, impounds the Nashua River, creating the Wachusett Reservoir. Construction started in 1897 and was completed in 1905. It is part of the Nashua River Watershed. This dam is part of greater Boston's water system, maintained and controlled by the Massachusetts Water Resources Authority (MWRA). Its discharge is into the Nashua River. When it was completed in 1905, the Wachusett Reservoir was the largest public water supply reservoir in the world. At that time, the Wachusett Reservoir Dam was the largest gravity dam in the world as well. (en)
rdfs:label
  • Wachusett Dam (en)
owl:sameAs
geo:geometry
  • POINT(-71.687774658203 42.403610229492)
geo:lat
  • 42.403610 (xsd:float)
geo:long
  • -71.687775 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Wachusett Dam (en)
  • Wachusett Reservoir Dam (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License