An Entity of Type: ship, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The first USS T-1 (SS-52/SF-1) was an AA-1-class submarine in the service of the United States Navy; T-1 was also known as Schley and AA-1. She was laid down as USS Schley on 21 June 1916 at the Fore River Shipbuilding Company yard in Quincy, Massachusetts, by the Electric Boat Co. of New York, renamed AA-1 on 23 August 1917 to free the name Schley for a destroyer, launched on 25 July 1918, sponsored by Mrs. Lilian Hovey-King, and commissioned on 30 January 1920 at Boston, Massachusetts, with Lt. Comdr in command.

Property Value
dbo:MeanOfTransportation/length
  • 81686.4 (dbd:millimetre)
dbo:abstract
  • T-1 (USS T-1, SS-52/SF-1) は、アメリカ海軍の潜水艦。AA-1級潜水艦の1番艦。当初の艦名はシューレイ (USS Schley) であった。 (ja)
  • The first USS T-1 (SS-52/SF-1) was an AA-1-class submarine in the service of the United States Navy; T-1 was also known as Schley and AA-1. She was laid down as USS Schley on 21 June 1916 at the Fore River Shipbuilding Company yard in Quincy, Massachusetts, by the Electric Boat Co. of New York, renamed AA-1 on 23 August 1917 to free the name Schley for a destroyer, launched on 25 July 1918, sponsored by Mrs. Lilian Hovey-King, and commissioned on 30 January 1920 at Boston, Massachusetts, with Lt. Comdr in command. AA-1 was one of three boats designed and constructed under a project charged with developing fleet submarines; that is, undersea boats possessing the sea-keeping qualities and endurance capability required for long-range operations, as scouts for the surface fleet. On 17 July 1920, while the submarine was being fitted-out, the Navy adopted its modern system of alpha-numeric hull numbers, and the fleet submarine was designated SF-1. On 20 September, she was renamed T-1. Thus, by the time she began active service that fall, she was known as T-1 (SF-1). T-1's commissioned service lasted less than three years. She operated out of Hampton Roads, Virginia, training crews and conducting maneuvers along the east coast with other units of the U.S. Atlantic Fleet. Throughout the entire period, she remained a unit of . However, during her service, flaws in her design and construction—particularly in her propulsion plant—became apparent. On 5 December 1922, T-1 was placed out of commission and laid up at the Submarine Base, Hampton Roads, Va. Later, she was moved to Philadelphia, Pennsylvania. After almost eight years of inactivity, her name was struck from the Navy list on 19 September 1930. Her hulk was broken up, and the materials were sold for scrap on 20 November 1930. (en)
dbo:builder
dbo:class
dbo:commissioningDate
  • 1920-01-30 (xsd:date)
dbo:decommissioningDate
  • 1922-12-05 (xsd:date)
dbo:layingDown
  • 1916-06-21 (xsd:date)
dbo:length
  • 81.686400 (xsd:double)
dbo:shipBeam
  • 6.705600 (xsd:double)
dbo:shipDraft
  • 4.267200 (xsd:double)
dbo:shipLaunch
  • 1918-07-25 (xsd:date)
dbo:status
  • Scrapped 1931
dbo:thumbnail
dbo:topSpeed
  • 37.040000 (xsd:double)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 757270 (xsd:integer)
dbo:wikiPageLength
  • 5768 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1091600059 (xsd:integer)
dbo:wikiPageWikiLink
dbp:shipArmament
  • *six 18 inch (450 mm) torpedo tubes , * two /23 caliber deck guns * one /50 caliber deck gun (en)
dbp:shipBuilder
dbp:shipClass
  • diesel-electric submarine (en)
dbp:shipCommissioned
  • 1920-01-30 (xsd:date)
dbp:shipComplement
  • 4 (xsd:integer)
dbp:shipCountry
  • United States (en)
dbp:shipDecommissioned
  • 1922-12-05 (xsd:date)
dbp:shipDisplacement
  • *1,107 tons surfaced *1,482 tons submerged (en)
dbp:shipDraft
  • mean (en)
dbp:shipFate
  • Scrapped 1931 (en)
dbp:shipLaidDown
  • 1916-06-21 (xsd:date)
dbp:shipLaunched
  • 1918-07-25 (xsd:date)
dbp:shipName
  • AA-1 (en)
dbp:shipPropulsion
  • * four New London Ship & Engine four cycle six-cylinder diesels, each, and two Electro Dynamic main motors, each, direct drive; one NELSECO four cycle four-cylinder auxiliary diesel; two banks of 60 Exide batteries * two Maschinenfabrik Augsburg Nürnberg AG four cycle ten-cylinder diesels, each (en)
dbp:shipRange
  • at on 23,602–24,092 USgal oil fuel (en)
dbp:shipRenamed
  • 0001-07-20 (xsd:gMonthDay)
dbp:shipSpeed
  • * surfaced * submerged (en)
dbp:shipStruck
  • 1930-09-19 (xsd:date)
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
rdf:type
rdfs:comment
  • T-1 (USS T-1, SS-52/SF-1) は、アメリカ海軍の潜水艦。AA-1級潜水艦の1番艦。当初の艦名はシューレイ (USS Schley) であった。 (ja)
  • The first USS T-1 (SS-52/SF-1) was an AA-1-class submarine in the service of the United States Navy; T-1 was also known as Schley and AA-1. She was laid down as USS Schley on 21 June 1916 at the Fore River Shipbuilding Company yard in Quincy, Massachusetts, by the Electric Boat Co. of New York, renamed AA-1 on 23 August 1917 to free the name Schley for a destroyer, launched on 25 July 1918, sponsored by Mrs. Lilian Hovey-King, and commissioned on 30 January 1920 at Boston, Massachusetts, with Lt. Comdr in command. (en)
rdfs:label
  • T-1 (潜水艦) (ja)
  • USS T-1 (SS-52) (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • AA-1 (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License