An Entity of Type: Dock103216828, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020. The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter. In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal. Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency. BAE Systems opened a large logistics warehouse named the Resolution Building on Dova W

Property Value
dbo:abstract
  • The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020. The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter. In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal. Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency. BAE Systems opened a large logistics warehouse named the Resolution Building on Dova Way within the designated Business Park Area in October 2016, while and construction of a new access road from Salthouse Road to the Marina Village commenced in May 2017. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 26786560 (xsd:integer)
dbo:wikiPageLength
  • 19661 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 999723998 (xsd:integer)
dbo:wikiPageWikiLink
dbp:architect
dbp:areaTotalAcre
  • 400 (xsd:integer)
dbp:developer
  • Furness Enterprise Ltd (en)
dbp:location
dbp:logo
  • Waterfront Barrow Logo.png (en)
dbp:name
  • The Waterfront Barrow-in-Furness (en)
dbp:openingDate
  • 2020 (xsd:integer)
dbp:pushpinMap
  • Cumbria (en)
dbp:pushpinMapCaption
  • Location in Cumbria (en)
dbp:subdivisionName
  • Cumbria (en)
  • England (en)
dbp:subdivisionType
  • Country (en)
  • County (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 54.1012 -3.2192
rdf:type
rdfs:comment
  • The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020. The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter. In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal. Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency. BAE Systems opened a large logistics warehouse named the Resolution Building on Dova W (en)
rdfs:label
  • The Waterfront Barrow-in-Furness (en)
owl:sameAs
geo:geometry
  • POINT(-3.2191998958588 54.10120010376)
geo:lat
  • 54.101200 (xsd:float)
geo:long
  • -3.219200 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License