An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Lumding–Sabroom section is a railway line under Lumding railway division of Northeast Frontier Railway zone of Indian Railways. It is a single 1,676 mm (5 ft 6 in) broad-gauge track from Lumding in Nagaon District of Assam state to Agartala in West Tripura district of Tripura state. The 43 km-long 1,676 mm (5 ft 6 in) segment from Agartala southwards to Udaipur, Tripura was completed in 2016 and became operational on 23 January 2017. The remaining 70 km long track to Sabroom at the bank of Feni River at Bangladesh border was completed in 2019 and became operational on 3 October 2019.

Property Value
dbo:abstract
  • The Lumding–Sabroom section is a railway line under Lumding railway division of Northeast Frontier Railway zone of Indian Railways. It is a single 1,676 mm (5 ft 6 in) broad-gauge track from Lumding in Nagaon District of Assam state to Agartala in West Tripura district of Tripura state. The 43 km-long 1,676 mm (5 ft 6 in) segment from Agartala southwards to Udaipur, Tripura was completed in 2016 and became operational on 23 January 2017. The remaining 70 km long track to Sabroom at the bank of Feni River at Bangladesh border was completed in 2019 and became operational on 3 October 2019. (en)
dbo:lineLength
  • 503000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2008-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:status
  • Operational
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 35831851 (xsd:integer)
dbo:wikiPageLength
  • 5047 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1041753437 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Udaipur station in Tripura (en)
dbp:electrification
  • Not electrified / Diesel operated (en)
dbp:end
dbp:locale
  • Assam and Tripura in India (en)
dbp:mapState
  • collapsed (en)
dbp:name
  • Lumding–Sabroom section (en)
dbp:oldGauge
dbp:open
  • 2008 (xsd:integer)
dbp:operator
dbp:owner
dbp:start
dbp:status
  • Operational (en)
dbp:tracks
  • 1 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Lumding–Sabroom section is a railway line under Lumding railway division of Northeast Frontier Railway zone of Indian Railways. It is a single 1,676 mm (5 ft 6 in) broad-gauge track from Lumding in Nagaon District of Assam state to Agartala in West Tripura district of Tripura state. The 43 km-long 1,676 mm (5 ft 6 in) segment from Agartala southwards to Udaipur, Tripura was completed in 2016 and became operational on 23 January 2017. The remaining 70 km long track to Sabroom at the bank of Feni River at Bangladesh border was completed in 2019 and became operational on 3 October 2019. (en)
rdfs:label
  • Lumding–Sabroom section (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Lumding–Sabroom section (including Katakhal–Bairabi–Sairang, Katakhal–Jiribam–Imphal & Baraigram–Dullabcherra branch lines) (en)
is dbo:servingRailwayLine of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License