The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.

Property Value
dbo:abstract
  • The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW. (en)
dbo:wikiPageID
  • 59888215 (xsd:integer)
dbo:wikiPageLength
  • 1012 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1096244839 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 35.3229 -118.8124
rdf:type
rdfs:comment
  • The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW. (en)
rdfs:label
  • Redwood Solar Cluster (en)
owl:sameAs
geo:geometry
  • POINT(-118.81240081787 35.322898864746)
geo:lat
  • 35.322899 (xsd:float)
geo:long
  • -118.812401 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License