The Nanticoke Generating Station was a coal-fired power station in Nanticoke, Ontario in operation from 1972 to 2013. It was the largest coal power station in North America and, at full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, and provided as much as 15% of Ontario's electricity. It was decommissioned in 2013 as part of the Government of Ontario's commitment to eliminate coal power. A 44 MW photovoltaic power station, the Nanticoke Solar Facility, was built on the site and entered service in 2019.

Property Value
dbo:abstract
  • The Nanticoke Generating Station was a coal-fired power station in Nanticoke, Ontario in operation from 1972 to 2013. It was the largest coal power station in North America and, at full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, and provided as much as 15% of Ontario's electricity. It was decommissioned in 2013 as part of the Government of Ontario's commitment to eliminate coal power. A 44 MW photovoltaic power station, the Nanticoke Solar Facility, was built on the site and entered service in 2019. Prior to the commencement of decommissioning, Nanticoke was one of Canada's top ten single sources of greenhouse gases. (en)
  • La centrale de Nanticoke est la plus importante centrale thermique au charbon en Amérique du Nord, avec une puissance installée de 3 640 mégawatts. Elle est située dans le territoire de l'ancienne ville de Nanticoke, comté d'Haldimand, dans le sud-ouest de l'Ontario (Canada). La centrale appartient à Ontario Power Generation, une société de la Couronne du gouvernement de l'Ontario. Elle devait être fermée en 2009, dans le cadre de son programme de fermeture de toutes les centrales au charbon de la province, mais la transition a été retardée à plusieurs reprises. Le gouvernement ontarien évoque maintenant la date de 2014 comme échéance pour convertir la centrale à la biomasse. Avec la fermeture de quatre des huit groupes, la puissance installée de la centrale a été ramenée à 1 880 MW en 2012. Les données d'Environnement Canada indiquent que la centrale de Nanticoke se classe régulièrement comme premier émetteur de gaz à effet de serre au Canada, toutes catégories confondues avec un total de 15,43 millions de tonnes équivalent CO2 en 2008. La centrale est également un important émetteur d'oxyde d'azote, de dioxyde de soufre et de métaux lourds. À l’été 2020 après 3 ans de travaux, la démolition complète de la centrale et ses annexes ont été complétés. Les travaux de démolition et recyclage des matériaux ont été effectués pour l’entreprise Delsan-AIM. (fr)
dbo:averageAnnualGeneration
  • 86400000000000000.000000 (xsd:double)
dbo:buildingStartYear
  • 1967-01-01 (xsd:gYear)
dbo:capacityFactor
  • 69.000000 (xsd:float)
dbo:country
dbo:installedCapacity
  • 3964000000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 1972-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:status
  • D
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 4898695 (xsd:integer)
dbo:wikiPageLength
  • 18984 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1105649398 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 1972 (xsd:integer)
dbp:country
  • Canada (en)
dbp:location
dbp:name
  • Nanticoke Generating Station (en)
dbp:operator
dbp:owner
dbp:psAnnualGeneration
  • 24000.0
dbp:psCoolingSource
dbp:psElectricalCapFac
  • 69.0
dbp:psElectricalCapacity
  • 1880.0
  • 3964.0
dbp:psUnitsDecommissioned
  • 8 (xsd:integer)
dbp:status
  • D (en)
dbp:thFuelPrimary
dbp:thTechnology
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 42.8 -80.05027777777778
rdf:type
rdfs:comment
  • The Nanticoke Generating Station was a coal-fired power station in Nanticoke, Ontario in operation from 1972 to 2013. It was the largest coal power station in North America and, at full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, and provided as much as 15% of Ontario's electricity. It was decommissioned in 2013 as part of the Government of Ontario's commitment to eliminate coal power. A 44 MW photovoltaic power station, the Nanticoke Solar Facility, was built on the site and entered service in 2019. (en)
  • La centrale de Nanticoke est la plus importante centrale thermique au charbon en Amérique du Nord, avec une puissance installée de 3 640 mégawatts. Elle est située dans le territoire de l'ancienne ville de Nanticoke, comté d'Haldimand, dans le sud-ouest de l'Ontario (Canada). La centrale appartient à Ontario Power Generation, une société de la Couronne du gouvernement de l'Ontario. Elle devait être fermée en 2009, dans le cadre de son programme de fermeture de toutes les centrales au charbon de la province, mais la transition a été retardée à plusieurs reprises. Le gouvernement ontarien évoque maintenant la date de 2014 comme échéance pour convertir la centrale à la biomasse. Avec la fermeture de quatre des huit groupes, la puissance installée de la centrale a été ramenée à 1 880 MW en 201 (fr)
rdfs:label
  • Centrale thermique de Nanticoke (fr)
  • Nanticoke Generating Station (en)
owl:sameAs
geo:geometry
  • POINT(-80.050277709961 42.799999237061)
geo:lat
  • 42.799999 (xsd:float)
geo:long
  • -80.050278 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Nanticoke Generating Station (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License