The M9, officially referred to as the M9 Ataköy-Olimpiyat line, is a rapid transit line of the Istanbul Metro system in the European part of Istanbul, Turkey. The line will be 17.4 km (10.8 mi) long with 14 stations and is expected to go into full service in 2023. It will run in a north-south direction, and will run through five districts of the city, namely Bakırköy, Bahçelievler, Bağcılar, Küçükçekmece and Başakşehir. The travel time between the end stations will be 19.5 minutes. It is expected that the metro line will carry around 500,000 riders daily. It will serve about 2.5 million people living in the area and visiting those districts.

Property Value
dbo:abstract
  • The M9, officially referred to as the M9 Ataköy-Olimpiyat line, is a rapid transit line of the Istanbul Metro system in the European part of Istanbul, Turkey. The line will be 17.4 km (10.8 mi) long with 14 stations and is expected to go into full service in 2023. It will run in a north-south direction, and will run through five districts of the city, namely Bakırköy, Bahçelievler, Bağcılar, Küçükçekmece and Başakşehir. The travel time between the end stations will be 19.5 minutes. It is expected that the metro line will carry around 500,000 riders daily. It will serve about 2.5 million people living in the area and visiting those districts. Connections to other metro lines will be at Ataköy to Marmaray, at Yenibosna to M1A (Yenikapı–Atatürk Airport), at Çobançeşme to (Yenikapı-Sefaköy), at Mimar Sinan to (Kirazlı-Halkalı), at Atatürk Mahallesi to (Mahmutbey-Bahçeşehir-Esenyurt) and at İkitelli Sanayi to M3 (Kirazlı-Başakşehir Olimpiyat). The construction of the metro line began in February 2016. The line consists of two tubes, which are being bored by four tunnel boring machines, two at each end. The city of Istanbul approved of a loan of € 338 million to complete the construction. While the Olimpiyatköy branch of the M3 line (Olimpiyat - İkitelli Sanayi) was unified with the M9 line, the first stage of the metro line (Bahariye - İkitelli Sanayi) was completed and opened on 29 May 2021. The M9 operates between Bahariye and Olimpiyat until the full opening in 2023, extending the line between Olimpiyat and Ataköy. (en)
  • М9, або офіційно лінія М9 Атакьой — Олімпіят, (тур. M9 Ataköy-Olimpiyat) — лінія Стамбульського метро у фракійській частині Стамбула, Туреччина. Лінія має бути завдовжки 17,4 км з 14 станціями і, має запрацювати в повному обсязі в 2023 році.Вона курсуватиме у напрямку з півночі на південь і проходитиме через п'ять районів міста, а саме Бакиркьой, Бахчеліевлер, Багджилар, Кючюкчекмедже та Башакшехір.Час у дорозі між кінцевими станціями становитиме 19,5 хвилин.Очікується, що лінія метро щодня перевозитиме близько 500 000 пасажирів та обслуговувати близько 2,5 мільйонів осіб, що проживають у цьому районі та відвідують ці райони. Пересадки на інші лінії метро відбуватимуться з на Мармарай, з Єнібосна на М1А (Єнікапи —аеропорт Ататюрк), з на (Єнікапи — Сефакьой), з на (Кіразли — Халкали), з на (Махмутбей — Бахчешехір — Есенюрт) та з Ікітеллі-Санаї на M3 (Кіразли — Басаксехір — Олімпіяткой). Будівництво лінії метрополітену розпочато у серпні 2017 року. Відгалуження Олімпіяткой лінії М3 (Олімпіят — Ікітеллі Санаї) було об'єднано з лінією М9, перша черга лінії метро (Бахаріє — Ікітеллі Санаї) була завершена та відкрита 29 травня 2021 року. М9 працює між Бахаріє та Олімпіатом до повного відкриття в 2023 році, продовжуючи лінію між Олімпіатом та Атакьоєм. (uk)
dbo:closingDate
  • 2021-05-29 (xsd:date)
dbo:closingYear
  • 2021-01-01 (xsd:gYear)
dbo:isPartOf
dbo:lineLength
  • 17400.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 5 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2021-05-29 (xsd:date)
dbo:openingYear
  • 2013-01-01 (xsd:gYear)
  • 2021-01-01 (xsd:gYear)
  • 2023-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 80.000000 (xsd:double)
dbo:status
  • Operational
  • Under Construction
  • (Bahariye - Ataköy)
  • (Olimpiyat - Bahariye)
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 50757017 (xsd:integer)
dbo:wikiPageLength
  • 7913 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1108828304 (xsd:integer)
dbo:wikiPageWikiLink
dbp:boxWidth
  • auto (en)
dbp:close
  • 0001-05-29 (xsd:gMonthDay)
dbp:color
  • FCD10D (en)
dbp:depot
  • Olimpiyatköy (en)
dbp:electrification
  • 1500 (xsd:integer)
dbp:end
dbp:imageWidth
  • 300 (xsd:integer)
dbp:linelengthKm
  • 17.400000 (xsd:double)
dbp:linenumber
  • M9 (en)
dbp:locale
  • Istanbul, Turkey (en)
dbp:logo
  • Istanbul M9 Line Symbol .svg (en)
dbp:logoWidth
  • 30 (xsd:integer)
dbp:mapState
  • show (en)
dbp:name
  • M9 Ataköy–Olimpiyat (en)
dbp:open
  • 2023 (xsd:integer)
  • 0001-11-22 (xsd:gMonthDay)
  • 2021-05-29 (xsd:date)
  • Ataköy - Bahariye (en)
  • Bahariye - Olimpiyat (en)
  • İkitelli Sanayi - Olimpiyat (en)
dbp:operator
dbp:owner
dbp:routes
  • 1 (xsd:integer)
dbp:speedKm/h
  • 80 (xsd:integer)
dbp:start
dbp:stations
  • 5 (xsd:integer)
dbp:status
  • (en)
  • Operational (en)
  • Under Construction (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The M9, officially referred to as the M9 Ataköy-Olimpiyat line, is a rapid transit line of the Istanbul Metro system in the European part of Istanbul, Turkey. The line will be 17.4 km (10.8 mi) long with 14 stations and is expected to go into full service in 2023. It will run in a north-south direction, and will run through five districts of the city, namely Bakırköy, Bahçelievler, Bağcılar, Küçükçekmece and Başakşehir. The travel time between the end stations will be 19.5 minutes. It is expected that the metro line will carry around 500,000 riders daily. It will serve about 2.5 million people living in the area and visiting those districts. (en)
  • М9, або офіційно лінія М9 Атакьой — Олімпіят, (тур. M9 Ataköy-Olimpiyat) — лінія Стамбульського метро у фракійській частині Стамбула, Туреччина. Лінія має бути завдовжки 17,4 км з 14 станціями і, має запрацювати в повному обсязі в 2023 році.Вона курсуватиме у напрямку з півночі на південь і проходитиме через п'ять районів міста, а саме Бакиркьой, Бахчеліевлер, Багджилар, Кючюкчекмедже та Башакшехір.Час у дорозі між кінцевими станціями становитиме 19,5 хвилин.Очікується, що лінія метро щодня перевозитиме близько 500 000 пасажирів та обслуговувати близько 2,5 мільйонів осіб, що проживають у цьому районі та відвідують ці райони. (uk)
rdfs:label
  • M9 (Istanbul Metro) (en)
  • М9 (Стамбульський метрополітен) (uk)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • M9 Ataköy–Olimpiyat (en)
is dbo:servingRailwayLine of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of