Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.

Property Value
dbo:abstract
  • Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. (en)
  • 苏州轨道交通7号线是中国江苏省苏州一条规划中的轨道交通线路。线路规划从相城区至吴中区木里站。其中红庄站至木里站作为苏州轨道交通4号线的支线已于2017年4月15日开通运营,该段线路全长11.1公里,设7个站,并设天鹅荡停车场一处。 (zh)
dbo:isPartOf
dbo:lineLength
  • 29600.000000 (xsd:double)
dbo:numberOfStations
  • 33 (xsd:nonNegativeInteger)
dbo:routeEnd
dbo:routeStart
dbo:status
  • Under construction
  • (one segment is operational)
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 36183343 (xsd:integer)
dbo:wikiPageLength
  • 5893 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1116153332 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Line 7 Under Construction at Tongyuanlu South station (en)
dbp:end
dbp:imageWidth
  • 265 (xsd:integer)
dbp:linelength
  • 29.6
dbp:logo
  • SZRT_Line_7_icon.svg (en)
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:operator
  • Suzhou Rail Transit Co., Ltd (en)
dbp:owner
  • Suzhou Rail Transit Co., Ltd (en)
dbp:start
dbp:stations
  • 33 (xsd:integer)
dbp:status
  • (en)
  • Under construction (en)
dbp:system
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019. The line will be 29.6 kilometers long. According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. (en)
  • 苏州轨道交通7号线是中国江苏省苏州一条规划中的轨道交通线路。线路规划从相城区至吴中区木里站。其中红庄站至木里站作为苏州轨道交通4号线的支线已于2017年4月15日开通运营,该段线路全长11.1公里,设7个站,并设天鹅荡停车场一处。 (zh)
rdfs:label
  • Line 7 (Suzhou Rail Transit) (en)
  • 苏州轨道交通7号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License