An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge. At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line (Line 1) was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Design of the Chengdu Yizhou Avenue Tram Demonstration Line". At the end of 2015, the names and locations of 16 stations on the line were announced. In January 2016, in order to alleviate the traffic pressure in the southern part of Chengdu, the Chengdu Tram Line 1 project announced the suspens

Property Value
dbo:abstract
  • Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge. At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line (Line 1) was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Design of the Chengdu Yizhou Avenue Tram Demonstration Line". At the end of 2015, the names and locations of 16 stations on the line were announced. In January 2016, in order to alleviate the traffic pressure in the southern part of Chengdu, the Chengdu Tram Line 1 project announced the suspension of construction. Chengdu Tram Line 1 would start at Chengdu South Railway Station and ends at Huayang, with a total of 16 stations. The total length of the line is 9.62 kilometers, of which the elevated section is 0.91 kilometers and the ground section is 8.71 kilometers. (en)
  • 有轨电车蓉1号线是四川省成都市规划中的一条现代路面有轨电车线路,曾用名益州大道有轨电车,全长9.62公里,设站16座。线路计划沿益州大道敷设,自成都南站出发到达华阳华龙大桥。2016年1月,为缓解成都城南片区交通压力,蓉1号线项目宣布暂缓开工建设。 (zh)
dbo:wikiPageID
  • 66567216 (xsd:integer)
dbo:wikiPageLength
  • 2024 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1004065529 (xsd:integer)
dbo:wikiPageWikiLink
dbp:beganOperation
  • Under planning (en)
dbp:lines
  • 1 (xsd:integer)
dbp:locale
dbp:name
  • Chengdu Tram Line 1 (en)
dbp:stations
  • 16 (xsd:integer)
dbp:systemLength
  • 9.62
dbp:trackGauge
  • Standard gauge (en)
dbp:transitType
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 有轨电车蓉1号线是四川省成都市规划中的一条现代路面有轨电车线路,曾用名益州大道有轨电车,全长9.62公里,设站16座。线路计划沿益州大道敷设,自成都南站出发到达华阳华龙大桥。2016年1月,为缓解成都城南片区交通压力,蓉1号线项目宣布暂缓开工建设。 (zh)
  • Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge. At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line (Line 1) was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Design of the Chengdu Yizhou Avenue Tram Demonstration Line". At the end of 2015, the names and locations of 16 stations on the line were announced. In January 2016, in order to alleviate the traffic pressure in the southern part of Chengdu, the Chengdu Tram Line 1 project announced the suspens (en)
rdfs:label
  • Line 1 (Chengdu Tram) (en)
  • 成都有轨电车蓉1号线 (zh)
owl:differentFrom
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License