Kathmandu–Terai Expressway, also known as Fast Track, is an under construction road connecting Kathmandu and Nijgadh in southern Terai region of Nepal. The road is 72.5 kilometres (45.0 mi) long, of which, 55.5 kilometres (34.5 mi) is normal roads, 10.59 kilometres (6.58 mi) is tunnel and 6.41 kilometres (3.98 mi) is bridges. The expressway is being constructed by Nepal Army, originally scheduled to be completed by September 2021. The new set target date for completion is 2024. As of July 2021, 16.1% of the work has been completed.
Property | Value |
---|---|
dbo:Infrastructure/length |
|
dbo:abstract |
|
dbo:length |
|
dbo:routeEnd | |
dbo:routeNumber |
|
dbo:routeStart | |
dbo:routeTypeAbbreviation |
|
dbo:thumbnail | |
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink | |
dbp:alternateName |
|
dbp:country |
|
dbp:lengthKm |
|
dbp:mapCustom |
|
dbp:mapNotes |
|
dbp:markerImage |
|
dbp:name |
|
dbp:nextDab |
|
dbp:nextRoute |
|
dbp:nextType |
|
dbp:previousDab |
|
dbp:previousRoute |
|
dbp:previousType |
|
dbp:route |
|
dbp:terminusA |
|
dbp:terminusB |
|
dbp:type |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:homepage | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageRedirects of | |
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |