An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Harbinxi (West) railway station is a railway station on the Jingha Railway and the Harbin–Dalian section of the Beijing–Harbin High-Speed Railway. It is located in Harbin, in the Heilongjiang province of China. The station cost 7.01 billion yuan to construct. The main building contains 70,000 square metres (750,000 sq ft) of space. There is a 92,000 square metres (990,000 sq ft) weather shed. Ten platforms of some 100,000 square metres (1,100,000 sq ft) serve twenty two rail lines and can accommodate a maximum of 12,000 passengers.

Property Value
dbo:abstract
  • Harbinxi (West) railway station is a railway station on the Jingha Railway and the Harbin–Dalian section of the Beijing–Harbin High-Speed Railway. It is located in Harbin, in the Heilongjiang province of China. The station cost 7.01 billion yuan to construct. The main building contains 70,000 square metres (750,000 sq ft) of space. There is a 92,000 square metres (990,000 sq ft) weather shed. Ten platforms of some 100,000 square metres (1,100,000 sq ft) serve twenty two rail lines and can accommodate a maximum of 12,000 passengers. (en)
  • ハルビン西駅(哈爾浜西駅、ハルビンにしえき、簡体字中国語: 哈尔滨西站)は中華人民共和国黒龍江省哈爾濱市南崗区にある、中国鉄路総公司(CR)とハルビン地下鉄の駅。隣の哈爾濱駅と共に特等駅である。 (ja)
  • 하얼빈 서역(중국어: 哈尔滨西站)은 하얼빈시 난강구와 에 위치한 철도역이다, 다오리구 및 난강구 중심가에서 모두 5km, 하얼빈역에서 7.2km, 하얼빈 타이핑 국제공항에서 약 25km 떨어져 있다. 중국의 “4종4횡” 철도급행 여객수송로중 하나인 하다 여객전용선의 역 중 가장 크며, 동시에 중국의 특등역 중 최북단에 위치한다. 2009년 7월 5일 하얼빈 서역과 가 동시에 착공되었고, 2012년 8월 29일 준공, 2012년 12월 1일 정식으로 운영에 들어갔다. 하얼빈 서역의 투입으로 하얼빈 및 주변 구역의 교통시간이 대폭 단축되었으며, 이 완공되어 하다 여객전용선과 직결하면서 G자 고속열차가 약 5시간 동안 베이징-하얼빈 간을 왕복하면서 에 비해 전체 운행 시간이 60% 가까이 단축되었다. 하얼빈 서역은 2020년까지 연평균 2000만 명 이상의 여객 수송을 목표로 하고 있다. (ko)
  • 哈尔滨西站位于中国黑龙江省哈尔滨市南岗区哈西新区,距道里区和南岗区中心区大约均为5公里,距离哈尔滨站7.2公里,距哈尔滨太平国际机场约为25公里,为中国规划建设“四纵四横”铁路快速客运通道中哈大客运专线上的一座特等站。2009年7月5日哈尔滨西站与哈齐高速铁路同时开工建设,2012年8月29日落成,2012年12月1日正式投入运营。 哈尔滨西站投入使用后,哈尔滨及周边区域的交通时间大幅缩短。京沈客运专线落成并与哈大客运专线贯通后,G字头高速动车组往返于京哈两地时间仅需约5个小时,与T17/18次列车相比,全程旅行时间缩短近60%。预计到2030年,哈尔滨西站旅客年均发送量将突破3000万人次。 (zh)
dbo:address
  • Nangang District,Harbin,Heilongjiang (en)
dbo:agencyStationCode
  • Pinyin code: HEX
  • TMIS code: 53469
  • Telegraph code: VAB
dbo:openingYear
  • 2012-01-01 (xsd:gYear)
dbo:servingRailwayLine
dbo:thumbnail
dbo:wikiPageID
  • 26498973 (xsd:integer)
dbo:wikiPageLength
  • 6175 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1098105043 (xsd:integer)
dbo:wikiPageWikiLink
dbp:address
dbp:caption
  • Harbin West railway station (en)
dbp:classification
dbp:code
  • (en)
  • Pinyin code: HEX (en)
  • TMIS code: 53469 (en)
  • Telegraph code: VAB (en)
dbp:country
  • China (en)
dbp:line
dbp:name
  • Harbinxi (en)
dbp:nativeName
  • (en)
dbp:nativeNameLang
  • zh-Hans (en)
dbp:opened
  • 2012 (xsd:integer)
dbp:operator
dbp:otherName
  • Harbin West (en)
dbp:platforms
  • 18 (xsd:integer)
dbp:symbol
  • metro (en)
  • rail (en)
  • crh (en)
dbp:symbolLocation
  • cn (en)
  • harbin (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 45.70472222222222 126.57305555555556
rdf:type
rdfs:comment
  • Harbinxi (West) railway station is a railway station on the Jingha Railway and the Harbin–Dalian section of the Beijing–Harbin High-Speed Railway. It is located in Harbin, in the Heilongjiang province of China. The station cost 7.01 billion yuan to construct. The main building contains 70,000 square metres (750,000 sq ft) of space. There is a 92,000 square metres (990,000 sq ft) weather shed. Ten platforms of some 100,000 square metres (1,100,000 sq ft) serve twenty two rail lines and can accommodate a maximum of 12,000 passengers. (en)
  • ハルビン西駅(哈爾浜西駅、ハルビンにしえき、簡体字中国語: 哈尔滨西站)は中華人民共和国黒龍江省哈爾濱市南崗区にある、中国鉄路総公司(CR)とハルビン地下鉄の駅。隣の哈爾濱駅と共に特等駅である。 (ja)
  • 하얼빈 서역(중국어: 哈尔滨西站)은 하얼빈시 난강구와 에 위치한 철도역이다, 다오리구 및 난강구 중심가에서 모두 5km, 하얼빈역에서 7.2km, 하얼빈 타이핑 국제공항에서 약 25km 떨어져 있다. 중국의 “4종4횡” 철도급행 여객수송로중 하나인 하다 여객전용선의 역 중 가장 크며, 동시에 중국의 특등역 중 최북단에 위치한다. 2009년 7월 5일 하얼빈 서역과 가 동시에 착공되었고, 2012년 8월 29일 준공, 2012년 12월 1일 정식으로 운영에 들어갔다. 하얼빈 서역의 투입으로 하얼빈 및 주변 구역의 교통시간이 대폭 단축되었으며, 이 완공되어 하다 여객전용선과 직결하면서 G자 고속열차가 약 5시간 동안 베이징-하얼빈 간을 왕복하면서 에 비해 전체 운행 시간이 60% 가까이 단축되었다. 하얼빈 서역은 2020년까지 연평균 2000만 명 이상의 여객 수송을 목표로 하고 있다. (ko)
  • 哈尔滨西站位于中国黑龙江省哈尔滨市南岗区哈西新区,距道里区和南岗区中心区大约均为5公里,距离哈尔滨站7.2公里,距哈尔滨太平国际机场约为25公里,为中国规划建设“四纵四横”铁路快速客运通道中哈大客运专线上的一座特等站。2009年7月5日哈尔滨西站与哈齐高速铁路同时开工建设,2012年8月29日落成,2012年12月1日正式投入运营。 哈尔滨西站投入使用后,哈尔滨及周边区域的交通时间大幅缩短。京沈客运专线落成并与哈大客运专线贯通后,G字头高速动车组往返于京哈两地时间仅需约5个小时,与T17/18次列车相比,全程旅行时间缩短近60%。预计到2030年,哈尔滨西站旅客年均发送量将突破3000万人次。 (zh)
rdfs:label
  • Harbin West railway station (en)
  • 하얼빈 서역 (ko)
  • ハルビン西駅 (ja)
  • 哈尔滨西站 (zh)
owl:sameAs
geo:geometry
  • POINT(126.57305908203 45.704723358154)
geo:lat
  • 45.704723 (xsd:float)
geo:long
  • 126.573059 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Harbinxi (en)
is dbo:routeStart of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:start of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License