Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h, the distance between Delhi and Alwar will be covered in 104 minutes. The project is expected to cost ₹37,000 crores. The Phase-I construction is expected to be complete by December 2024.

Property Value
dbo:abstract
  • Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h, the distance between Delhi and Alwar will be covered in 104 minutes. The project is expected to cost ₹37,000 crores. The Phase-I construction is expected to be complete by December 2024. (en)
dbo:averageSpeed
  • 100.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 22 (xsd:nonNegativeInteger)
dbo:openingYear
  • 2025-01-01 (xsd:gYear)
dbo:owner
dbo:thumbnail
dbo:topSpeed
  • 160.000000 (xsd:double)
dbo:type
dbo:typeOfElectrification
dbo:voltageOfElectrification
  • 25000.000000 (xsd:double)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 55291171 (xsd:integer)
dbo:wikiPageLength
  • 15191 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1107305432 (xsd:integer)
dbo:wikiPageWikiLink
dbp:areaServed
  • Alwar (en)
  • Delhi (en)
  • Gurgaon (en)
  • Rewari (en)
  • (en)
dbp:averageSpeed
  • 100.0
dbp:el
  • 25 (xsd:integer)
dbp:end
  • Alwar/Sotanala (en)
dbp:headway
  • 600.0
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:notrack
  • 2 (xsd:integer)
dbp:operationWillStart
  • April 2025 (en)
dbp:owner
dbp:start
  • Sarai Kale Khan (en)
dbp:stations
  • 22 (xsd:integer)
dbp:systemLength
  • 164.0
dbp:topSpeed
  • 160.0
dbp:trackGauge
  • (en)
dbp:transitType
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h, the distance between Delhi and Alwar will be covered in 104 minutes. The project is expected to cost ₹37,000 crores. The Phase-I construction is expected to be complete by December 2024. (en)
rdfs:label
  • Delhi–Alwar Regional Rapid Transit System (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License