An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Brunswick–Altamaha Canal was a 12-mile-long canal built to connect the Altamaha River to the city of Brunswick, Georgia at the Turtle River to transport goods from Brunswick's port to areas farther north and inland. It included locks on both ends of the canal. The canal was originally proposed in 1798 and after two failed charters (1826 and 1830), construction was started in 1836 by Thomas Butler King. The project was estimated to cost $450,000. The canal was finished and opened in 1854; however, by that time the canal was obsolete because of new railroads. The canal was closed by 1860. The Columbian mammoth was discovered during the construction of the canal.

Property Value
dbo:abstract
  • The Brunswick–Altamaha Canal was a 12-mile-long canal built to connect the Altamaha River to the city of Brunswick, Georgia at the Turtle River to transport goods from Brunswick's port to areas farther north and inland. It included locks on both ends of the canal. The canal was originally proposed in 1798 and after two failed charters (1826 and 1830), construction was started in 1836 by Thomas Butler King. The project was estimated to cost $450,000. The canal was finished and opened in 1854; however, by that time the canal was obsolete because of new railroads. The canal was closed by 1860. The Columbian mammoth was discovered during the construction of the canal. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 50229080 (xsd:integer)
dbo:wikiPageLength
  • 1749 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 952038812 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • The Brunswick–Altamaha Canal was a 12-mile-long canal built to connect the Altamaha River to the city of Brunswick, Georgia at the Turtle River to transport goods from Brunswick's port to areas farther north and inland. It included locks on both ends of the canal. The canal was originally proposed in 1798 and after two failed charters (1826 and 1830), construction was started in 1836 by Thomas Butler King. The project was estimated to cost $450,000. The canal was finished and opened in 1854; however, by that time the canal was obsolete because of new railroads. The canal was closed by 1860. The Columbian mammoth was discovered during the construction of the canal. (en)
rdfs:label
  • Brunswick–Altamaha canal (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License