Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet, and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches.

Property Value
dbo:abstract
  • Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet, and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 3033808 (xsd:integer)
dbo:wikiPageRevisionID
  • 737821057 (xsd:integer)
dct:subject
http://purl.org/linguistics/gold/hypernym
rdf:type
rdfs:comment
  • Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet, and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches. (en)
rdfs:label
  • Tunnel hole-through (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is foaf:primaryTopic of