The Sengkang LRT Line is a 10.7 kilometres (6.6 mi) light rail line which initially opened on 18 January 2003. The line connects the residential districts and suburbs of Sengkang to the Sengkang Town Centre, where it connects with the North East Line and the Sengkang Bus Interchange. It is the second LRT system in Singapore and is fully automated. The line uses Crystal Mover rolling stock supplied by Mitsubishi Heavy Industries.

Property Value
dbo:abstract
  • The Sengkang LRT Line is a 10.7 kilometres (6.6 mi) light rail line which initially opened on 18 January 2003. The line connects the residential districts and suburbs of Sengkang to the Sengkang Town Centre, where it connects with the North East Line and the Sengkang Bus Interchange. It is the second LRT system in Singapore and is fully automated. The line uses Crystal Mover rolling stock supplied by Mitsubishi Heavy Industries. (en)
  • LRTセンカン線Sengkang LRT Lineは、シンガポールのSBSトランジットが運営する新交通システム、ライト・レール・トランジットの路線である。 (ja)
  • 盛港輕軌(英文:Sengkang LRT Line)是新加坡的第2條輕軌鐵路,全長10.7公里,共有14個站。 盛港輕軌的東環於2003年啟用,西環於2005年啟用,主要服務盛港的居民。 (zh)
dbo:isPartOf
dbo:lineLength
  • 10700.000000 (xsd:double)
dbo:numberOfStations
  • 14 (xsd:integer)
dbo:openingDate
  • 2003-01-18 (xsd:date)
  • 2005-01-29 (xsd:date)
dbo:openingYear
  • 2003-01-01 (xsd:date)
  • 2005-01-01 (xsd:date)
dbo:operator
dbo:owner
dbo:railGauge
  • 1.850000 (xsd:double)
dbo:railwayRollingStock
dbo:routeStart
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:typeOfElectrification
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 1148693 (xsd:integer)
dbo:wikiPageRevisionID
  • 742913431 (xsd:integer)
dbp:boxWidth
  • auto
dbp:imageWidth
  • 200 (xsd:integer)
dbp:mapState
  • collapsed
dbp:routes
  • 2 (xsd:integer)
dct:subject
rdf:type
rdfs:comment
  • The Sengkang LRT Line is a 10.7 kilometres (6.6 mi) light rail line which initially opened on 18 January 2003. The line connects the residential districts and suburbs of Sengkang to the Sengkang Town Centre, where it connects with the North East Line and the Sengkang Bus Interchange. It is the second LRT system in Singapore and is fully automated. The line uses Crystal Mover rolling stock supplied by Mitsubishi Heavy Industries. (en)
  • LRTセンカン線Sengkang LRT Lineは、シンガポールのSBSトランジットが運営する新交通システム、ライト・レール・トランジットの路線である。 (ja)
  • 盛港輕軌(英文:Sengkang LRT Line)是新加坡的第2條輕軌鐵路,全長10.7公里,共有14個站。 盛港輕軌的東環於2003年啟用,西環於2005年啟用,主要服務盛港的居民。 (zh)
rdfs:label
  • Sengkang LRT Line (en)
  • LRTセンカン線 (ja)
  • 盛港輕軌 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Sengkang LRT Line (en)
is dbo:wikiPageRedirects of
is dbp:lines of
is foaf:primaryTopic of