Nemo Link is a HVDC submarine power cable under construction between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium. The project is a joint venture between British National Grid and Belgian Elia. The electrical interconnector will be the first between the two countries and capable of transmitting up to 1,000 MW at 400 kV i.e. an annual transmission capacity of 8.76 TWh. The total cable length will be 140 km of which 130 km will be under water. As of August 2015 onshore construction has started with offshore construction scheduled to start in 2016.

Property Value
dbo:abstract
  • Der Nemo Link ist eine in Bau befindliche Hochspannungs-Gleichstrom-Verbindung in der Nordsee. Sie soll 2019 in Betrieb genommen werden und das Stromnetz des Vereinigten Königreiches an das belgische Netz anbinden. Ausgeführt wird das Projekt von den beiden Stromnetzbetreibern National Grid und Elia. Endpunkt in England ist das Gelände des stillgelegten Kraftwerk Richborough. Auf belgischer Seite endet das Kabel im Industriegebiet Herdersbrug, einem Stadtteil von Brügge. Verlegt werden sollen zwei Seekabel, die mit einer Gleichspannung von 400 kV betrieben werden. Die Übertragungsleistung liegt bei 1 GW. Gründe für den Bau sind u.a. die Kopplung der Strommärkte von Großbritannien und Belgien, mit denen eine Kostensenkung der Strompreise erreicht werden soll sowie die Erhöhung der Energiesicherheit beider Staaten. Zudem sollen erneuerbare Energien, v. a. Windkraftanlagen, besser in das europäische Energiesystem eingebunden werden, da durch überregionalen Stromaustausch die Variabilität der Erzeugung deutlich verringert werden kann. (de)
  • Nemo Link is a HVDC submarine power cable under construction between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium. The project is a joint venture between British National Grid and Belgian Elia. The electrical interconnector will be the first between the two countries and capable of transmitting up to 1,000 MW at 400 kV i.e. an annual transmission capacity of 8.76 TWh. The total cable length will be 140 km of which 130 km will be under water. In 2015 contracts totalling €500 million were awarded to Siemens for the construction of the two onshore converter stations and to J-Power systems for the cable system. As of August 2015 onshore construction has started with offshore construction scheduled to start in 2016. The contract for the laying of the actual cable has been awarded to DeepOcean who expect to perform that work in 2017 and 2018. The cable is expected to be operational by 2019. (en)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 49313206 (xsd:integer)
dbo:wikiPageRevisionID
  • 733595906 (xsd:integer)
dbp:cableInstaller
dbp:cableManufacturer
dbp:capacity
  • 1000.0
dbp:country
dbp:currentType
dbp:dcVoltage
  • 400.0
dbp:finish
  • Richborough, Kent, England
dbp:lengthKm
  • 140 (xsd:integer)
dbp:name
  • Nemo Link
dbp:partners
dbp:start
  • Zeebrugge, Belgium
dbp:substationInstaller
dbp:substationManufacturer
dbp:through
dbp:type
  • submarine cable
dct:subject
http://purl.org/linguistics/gold/hypernym
rdf:type
rdfs:comment
  • Der Nemo Link ist eine in Bau befindliche Hochspannungs-Gleichstrom-Verbindung in der Nordsee. Sie soll 2019 in Betrieb genommen werden und das Stromnetz des Vereinigten Königreiches an das belgische Netz anbinden. Ausgeführt wird das Projekt von den beiden Stromnetzbetreibern National Grid und Elia. (de)
  • Nemo Link is a HVDC submarine power cable under construction between Richborough Energy Park in Kent, the United Kingdom and Zeebrugge, Belgium. The project is a joint venture between British National Grid and Belgian Elia. The electrical interconnector will be the first between the two countries and capable of transmitting up to 1,000 MW at 400 kV i.e. an annual transmission capacity of 8.76 TWh. The total cable length will be 140 km of which 130 km will be under water. As of August 2015 onshore construction has started with offshore construction scheduled to start in 2016. (en)
rdfs:label
  • Nemo Link (de)
  • Nemo link (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is foaf:primaryTopic of