The A11 highway is a highway in northern Croatia, which will connect the city of Sisak via Velika Gorica to Zagreb. Construction began in 2007, advancing from north to south. One 9 km subsection between Velika Gorica and Buševec is currently open (since May 2009). The road is meant to connect to new road and bridge infrastructure at the southern approaches to Zagreb, relieving the existing major interchanges of the Zagreb bypass at Buzin and Lučko.
| Property | Value |
| dbpedia-owl:thumbnail
| |
| dbpprop:abstract
|
- The A11 highway is a highway in northern Croatia, which will connect the city of Sisak via Velika Gorica to Zagreb. Construction began in 2007, advancing from north to south. One 9 km subsection between Velika Gorica and Buševec is currently open (since May 2009). The road is meant to connect to new road and bridge infrastructure at the southern approaches to Zagreb, relieving the existing major interchanges of the Zagreb bypass at Buzin and Lučko. The highway would be important to commuters from Velika Gorica and Turopolje who have to use the Velikogorička road to get to Zagreb, a single-lane road which is congested during rush hour.
- Die Autobahn A11 in Kroatien befindet sich teilweise in Bau und soll in den nächsten Jahren die Industriestadt Sisak mit Velika Gorica, dem Flughafen sowie der Hauptstadt Zagreb verbinden. Sie entlastet damit einige Gemeinden entlang der D30. Zwischen Zagreb und Velika Gorica besteht eine vierspurige, aber nicht ampelfreie Strecke. Diese Strecke wird nicht ausgebaut, sondern östlich umfahren, Velika Gorica hingegen westlich. Der 9 km lange Abschnitt Velika Gorica-Buševec wurde am 9. Mai 2009 für den Verkehr freigegeben. Die Fertigstellung der gesamten Autobahn bis Sisak ist bis spätestens 2011 vorgesehen. Die Autobahn führt durch die mittelkroatische Region Turopolje.
- De A11 is een snelweg in Kroatië die op dit moment (juli 2007) nog in aanbouw is. Als de weg voltooid is moet het totale traject tussen Zagreb, Velika Gorica en de industriestad Sisak in totaal 47,5 kilometer bedragen. De bouw van de snelweg is begonnen in 2005 en zal volgens de planning tot in 2011 duren. Het eerste deel van de snelweg wordt vanaf Zagreb aangelegd. Het zuidelijke stuk van de weg wordt als laatste voltooid.
- Autostrada A11 (Autocesta A11) – budowana autostrada w Chorwacji. Ma połączyć miasta Velika Gorica i Sisak z Zagrzebiem. Budowa rozpoczęła się w 2007 roku i miała być prowadzona z północy na południe. Jednak z powodu protestów ekologów i problemów z wykupem ziemi, północną część trasy dotknęły opóźnienia, a jako pierwszy został zbudowany krótki odcinek w pobliżu miasta Velika Gorica. Budowa autostrady ma bardzo ważne znaczenie dla mieszkańców miast Velika Gorica i Turopolje, którzy póki co zmuszeni są dojeżdżać do stolicy zakorkowaną drogą krajową.
|
| dbpprop:cities
| |
| dbpprop:countries
| |
| dbpprop:endingTerminus
| |
| dbpprop:hasPhotoCollection
| |
| dbpprop:lengthKm
| |
| dbpprop:map
| |
| dbpprop:markerImage
| |
| dbpprop:name
| |
| dbpprop:plalength
| |
| dbpprop:reference
| |
| dbpprop:regions
| |
| dbpprop:startingTerminus
| |
| dbpprop:wikiPageUsesTemplate
| |
| rdfs:comment
|
- The A11 highway is a highway in northern Croatia, which will connect the city of Sisak via Velika Gorica to Zagreb. Construction began in 2007, advancing from north to south. One 9 km subsection between Velika Gorica and Buševec is currently open (since May 2009). The road is meant to connect to new road and bridge infrastructure at the southern approaches to Zagreb, relieving the existing major interchanges of the Zagreb bypass at Buzin and Lučko.
- Die Autobahn A11 in Kroatien befindet sich teilweise in Bau und soll in den nächsten Jahren die Industriestadt Sisak mit Velika Gorica, dem Flughafen sowie der Hauptstadt Zagreb verbinden. Sie entlastet damit einige Gemeinden entlang der D30. Zwischen Zagreb und Velika Gorica besteht eine vierspurige, aber nicht ampelfreie Strecke. Diese Strecke wird nicht ausgebaut, sondern östlich umfahren, Velika Gorica hingegen westlich. Der 9 km lange Abschnitt Velika Gorica-Buševec wurde am 9.
- De A11 is een snelweg in Kroatië die op dit moment (juli 2007) nog in aanbouw is. Als de weg voltooid is moet het totale traject tussen Zagreb, Velika Gorica en de industriestad Sisak in totaal 47,5 kilometer bedragen. De bouw van de snelweg is begonnen in 2005 en zal volgens de planning tot in 2011 duren. Het eerste deel van de snelweg wordt vanaf Zagreb aangelegd. Het zuidelijke stuk van de weg wordt als laatste voltooid.
- Autostrada A11 (Autocesta A11) – budowana autostrada w Chorwacji. Ma połączyć miasta Velika Gorica i Sisak z Zagrzebiem. Budowa rozpoczęła się w 2007 roku i miała być prowadzona z północy na południe. Jednak z powodu protestów ekologów i problemów z wykupem ziemi, północną część trasy dotknęły opóźnienia, a jako pierwszy został zbudowany krótki odcinek w pobliżu miasta Velika Gorica.
|
| rdfs:label
|
- A11 (Croatia)
- A11 (Kroatien)
- A11 (Kroatië)
- Autostrada A11 (Chorwacja)
|
| owl:sameAs
| |
| skos:subject
| |
| foaf:depiction
| |
| foaf:page
| |
| is dbpprop:junction
of | |
| is dbpprop:redirect
of | |