The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A. Roebling's first suspension bridge, the Allegheny Aqueduct., the canal traveled underground through most of downtown Pittsburgh, under Grant's Hill, to end in a lock leading to the Monongahela River. The original plan was to connect with the C&O canal at the Monongahela River, but that canal never reached its expected western end, and the tunnel's main use was to allow overflow from the canal to enter the Monongahela. Only one or two canal boat
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Pennsylvania Canal Tunnel (en)
|
rdfs:comment
| - The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A. Roebling's first suspension bridge, the Allegheny Aqueduct., the canal traveled underground through most of downtown Pittsburgh, under Grant's Hill, to end in a lock leading to the Monongahela River. The original plan was to connect with the C&O canal at the Monongahela River, but that canal never reached its expected western end, and the tunnel's main use was to allow overflow from the canal to enter the Monongahela. Only one or two canal boat (en)
|
foaf:name
| - Pennsylvania Canal Tunnel (en)
|
name
| - Pennsylvania Canal Tunnel (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
waterway
| - Main Line of Public Works (en)
|
dbp:wikiPageUsesTemplate
| |
Closed
| |
construction
| |
end
| - Monongahela River at Suke's Run (en)
|
engineer
| |
length
| |
location
| - Pittsburgh, Pennsylvania (en)
|
opened
| |
start
| - Pittsburgh turning basin of the Western Division of the Pennsylvania canal (en)
|
status
| |
georss:point
| - 40.44138888888889 -79.99472222222222
|
has abstract
| - The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A. Roebling's first suspension bridge, the Allegheny Aqueduct., the canal traveled underground through most of downtown Pittsburgh, under Grant's Hill, to end in a lock leading to the Monongahela River. The original plan was to connect with the C&O canal at the Monongahela River, but that canal never reached its expected western end, and the tunnel's main use was to allow overflow from the canal to enter the Monongahela. Only one or two canal boats ever went through the tunnel and lock. The tunnel was made obsolete by the arrival of the Pennsylvania Railroad in 1852. The canal tunnel was uncovered during the construction of the U.S. Steel Tower in 1967, and later during the construction of the subway system, which used part of the tunnel on the south side. (en)
|
route start location
| |
gold:hypernym
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
closing year
| |
length (μ)
| |
status
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-79.994720458984 40.441387176514)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |