About: Locust Ridge Wind Farm     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FLocust_Ridge_Wind_Farm

The Locust Ridge Wind Farm is a large wind farm located near Mahanoy City in Schuylkill County, Pennsylvania, United States. The first phase, Locust Ridge I, has 13 Gamesa 2MW Wind Turbines that began commercial operation in 2006. The wind farm has a combined total nameplate capacity of 26 MW, producing about 68,328 megawatt-hours of electricity annually, which is enough to power 24,000 homes. Nearly all of the large wind turbines from Locust Ridge I and II can be seen from Interstate 81 near Frackville, Pennsylvania.

AttributesValues
rdf:type
rdfs:label
  • Locust Ridge Wind Farm (en)
rdfs:comment
  • The Locust Ridge Wind Farm is a large wind farm located near Mahanoy City in Schuylkill County, Pennsylvania, United States. The first phase, Locust Ridge I, has 13 Gamesa 2MW Wind Turbines that began commercial operation in 2006. The wind farm has a combined total nameplate capacity of 26 MW, producing about 68,328 megawatt-hours of electricity annually, which is enough to power 24,000 homes. Nearly all of the large wind turbines from Locust Ridge I and II can be seen from Interstate 81 near Frackville, Pennsylvania. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 40.71 -76.21997222222222
has abstract
  • The Locust Ridge Wind Farm is a large wind farm located near Mahanoy City in Schuylkill County, Pennsylvania, United States. The first phase, Locust Ridge I, has 13 Gamesa 2MW Wind Turbines that began commercial operation in 2006. The wind farm has a combined total nameplate capacity of 26 MW, producing about 68,328 megawatt-hours of electricity annually, which is enough to power 24,000 homes. Construction of Locust Ridge II began in 2008 with the installation of 51 additional Gamesa 2MW wind turbines that are projected to produce 102 MW of electricity. The calculated yearly production of the wind farm is estimated to produce 372,300 megawatt-hours of electricity, enough to power 40,000 additional homes in Northeastern Pennsylvania. Seven of the 51 wind turbines are located in Conyngham Township, Columbia County and the remaining turbines are located in Schuylkill County. Locust Ridge II became operational in late 2008. Nearly all of the large wind turbines from Locust Ridge I and II can be seen from Interstate 81 near Frackville, Pennsylvania. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-76.219970703125 40.709999084473)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software