In project management, float or slack is the amount of time that a task in a project network can be delayed without causing a delay to: * subsequent tasks ("free float") * project completion date ("total float"). Total float is associated with the path. If a project network chart/diagram has 4 non-critical paths then that project would have 4 total float values. The total float of a path is the combined free float values of all activities in a path.

AttributesValues
rdf:type
rdfs:label
  • Zeitfenster (de)
  • Float (project management) (en)
  • フロート (プロジェクト管理) (ja)
  • Tidsfönster (sv)
  • 时差 (项目管理) (zh)
rdfs:comment
  • Zeitfenster (Zeitkorridor, englisch time frame) ist im Zeitmanagement ein für die Erledigung einer bestimmten Aufgabe oder die Vornahme einer bestimmten Handlung zur Verfügung stehender Zeitraum. (de)
  • フロート (英: float)またはスラック (英: slack)は、プロジェクト管理では、内のタスクが遅延しても、次の遅延を及ぼさない余裕時間のこと。 * 後続タスクに遅延を及ぼさない(フリーフロート) * プロジェクト全体に遅延を及ぼさない(トータルフロート) トータルフロートはパスに関連付けられる。プロジェクトネットワーク図に4つのクリティカルでないパスがある場合、そのプロジェクトには合計4つのそれぞれのフロート値がある。パスのトータルフロートは、パス内のすべての活動のフリーフロート値の組み合わせとなる。 トータルフロートはスケジュールの柔軟性を表し、パスが完了するための遅い開始日から早い開始日を引くことで計算できる。 フロートはクリティカルパス法の中核概念であり、クリティカルでない活動のトータルフロートは、活動の、つまりプロジェクトの期間に追加される時間の長さを計算するための鍵となる。 (ja)
  • Ett tidsfönster är en kort tidsperiod under vilken en möjlighet uppträder eller ett visst förhållande råder. Begreppet används inom olika tekniska och ekonomiska sammanhang, exempelvis inom logistik för den tid då en leverans ska ske. (sv)
  • 在项目管理中时差或浮动时间(Float)是指工作或线路可以利用的机动时间,即在项目网络图中时差的延误不会造成紧后工作(自由时差或自由浮动时间)和总工期(总时差或总浮动时间)的延误。 在网络计划中,总时差(total float)最小的工作是关键工作,也就是具有的机动时间最小。全部由关键工作组成的路径即为关键路径,关键路径上总的工作持续时间最长。如右图的双代号网络图中,有6项工作、5个节点和3条路径,其中10-20-50(B-C)和10-30-40-50(A-D-F)是关键路径,工作持续时间7个月。10-30-50(A-E)是非关键路径,工作E有1个月的自由时差。 通过对总时差和自由时差的计算,确定关键路径和非关键路径,可以进行项目进度优化,提高工作效率。 (zh)
  • In project management, float or slack is the amount of time that a task in a project network can be delayed without causing a delay to: * subsequent tasks ("free float") * project completion date ("total float"). Total float is associated with the path. If a project network chart/diagram has 4 non-critical paths then that project would have 4 total float values. The total float of a path is the combined free float values of all activities in a path. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/CPMScheduleFloat.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • Zeitfenster (Zeitkorridor, englisch time frame) ist im Zeitmanagement ein für die Erledigung einer bestimmten Aufgabe oder die Vornahme einer bestimmten Handlung zur Verfügung stehender Zeitraum. (de)
  • In project management, float or slack is the amount of time that a task in a project network can be delayed without causing a delay to: * subsequent tasks ("free float") * project completion date ("total float"). Total float is associated with the path. If a project network chart/diagram has 4 non-critical paths then that project would have 4 total float values. The total float of a path is the combined free float values of all activities in a path. The total float represents the schedule flexibility and can also be measured by subtracting early start dates from late start dates of path completion. Float is core to critical path method, with the total floats of noncritical activities key to computing the critical path drag of an activity, i.e., the amount of time it is adding to the project's duration. (en)
  • フロート (英: float)またはスラック (英: slack)は、プロジェクト管理では、内のタスクが遅延しても、次の遅延を及ぼさない余裕時間のこと。 * 後続タスクに遅延を及ぼさない(フリーフロート) * プロジェクト全体に遅延を及ぼさない(トータルフロート) トータルフロートはパスに関連付けられる。プロジェクトネットワーク図に4つのクリティカルでないパスがある場合、そのプロジェクトには合計4つのそれぞれのフロート値がある。パスのトータルフロートは、パス内のすべての活動のフリーフロート値の組み合わせとなる。 トータルフロートはスケジュールの柔軟性を表し、パスが完了するための遅い開始日から早い開始日を引くことで計算できる。 フロートはクリティカルパス法の中核概念であり、クリティカルでない活動のトータルフロートは、活動の、つまりプロジェクトの期間に追加される時間の長さを計算するための鍵となる。 (ja)
  • Ett tidsfönster är en kort tidsperiod under vilken en möjlighet uppträder eller ett visst förhållande råder. Begreppet används inom olika tekniska och ekonomiska sammanhang, exempelvis inom logistik för den tid då en leverans ska ske. (sv)
  • 在项目管理中时差或浮动时间(Float)是指工作或线路可以利用的机动时间,即在项目网络图中时差的延误不会造成紧后工作(自由时差或自由浮动时间)和总工期(总时差或总浮动时间)的延误。 在网络计划中,总时差(total float)最小的工作是关键工作,也就是具有的机动时间最小。全部由关键工作组成的路径即为关键路径,关键路径上总的工作持续时间最长。如右图的双代号网络图中,有6项工作、5个节点和3条路径,其中10-20-50(B-C)和10-30-40-50(A-D-F)是关键路径,工作持续时间7个月。10-30-50(A-E)是非关键路径,工作E有1个月的自由时差。 通过对总时差和自由时差的计算,确定关键路径和非关键路径,可以进行项目进度优化,提高工作效率。 (zh)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software