About: Engineering change order     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FEngineering_change_order

An engineering change order (ECO), also called an engineering change note, engineering change notice (ECN), or engineering change (EC), is a document that is used to bring about authorized changes in components and assemblies. They may also be used for changes in documents such as drawings, processes, work instructions and specifications. It can also be used for "a modification that will have an effect on a manufactured product or manufacturing process."

AttributesValues
rdfs:label
  • أوامر التغيير الهندسي
  • Engineering change order
  • 工程改变命令
rdfs:comment
  • 工程改变命令(英語:Engineering change orders,缩写ECO;或称工程变更命令)用于改变元件、组件,或流程、工作指令文档,并也可用于改变规格。 ECO也被称为“工程变更通知单”、工程變更通知(ECN),或简单称“工程变更”(EC)。 在典型的系统开发周期中,规范或实现可能在工程开发期间或系统元件的集成期间改变。这些在最后一分钟的设计变更通常称为工程改变命令(ECO),并影响已完全或部分完成设计的功能。ECO可以弥补在调试期间发现的设计错误,或者对设计规范做出更改以补偿其他方面的系统设计。
  • يتم استخدام أوامر التغيير الهندسي (ECO) لإدخال تغييرات في المكونات، أو عمليات التجميع، أو المستندات مثل العمليات وإرشادات العمل. وقد يتم استخدامها أيضًا لإدخال تغييرات في المواصفات. ويطلق أيضًا على أمر التغيير الهندسي اسم إخطار التغيير الهندسي أو إشعار التغيير الهندسي (ECN) أو التغيير الهندسي (EC) فقط.
  • An engineering change order (ECO), also called an engineering change note, engineering change notice (ECN), or engineering change (EC), is a document that is used to bring about authorized changes in components and assemblies. They may also be used for changes in documents such as drawings, processes, work instructions and specifications. It can also be used for "a modification that will have an effect on a manufactured product or manufacturing process."
foaf:isPrimaryTopicOf
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • يتم استخدام أوامر التغيير الهندسي (ECO) لإدخال تغييرات في المكونات، أو عمليات التجميع، أو المستندات مثل العمليات وإرشادات العمل. وقد يتم استخدامها أيضًا لإدخال تغييرات في المواصفات. ويطلق أيضًا على أمر التغيير الهندسي اسم إخطار التغيير الهندسي أو إشعار التغيير الهندسي (ECN) أو التغيير الهندسي (EC) فقط. في دورة تطوير النظام التقليدية، قد تتغير المواصفات أو التطبيقات خلال عملية التطوير الهندسي أو أثناء دمج عناصر النظام. وعادةً ما يشار إلى تلك التغييرات في التصميم التي تحدث في آخر لحظة بوصفها أوامر تغيير هندسي (ECO)، حيث تؤثر على الأداء الوظيفي للتصميم بعد أن يكتمل كليًا أو جزئيًا. ويمكن لأوامر التغيير الهندسي أن تعوض أخطاء التصميم التي توجد أثناء التصحيح، أو التغييرات التي يتم إدخالها على مواصفات التصميم للتعويض عن مشكلات التصميم في جوانب أخرى من تصميم النظام.
  • An engineering change order (ECO), also called an engineering change note, engineering change notice (ECN), or engineering change (EC), is a document that is used to bring about authorized changes in components and assemblies. They may also be used for changes in documents such as drawings, processes, work instructions and specifications. It can also be used for "a modification that will have an effect on a manufactured product or manufacturing process." In a typical system development cycle, the specification or the implementation is likely to change during engineering development or during integration of the system elements. These last-minute design changes are commonly referred to as engineering change orders (ECOs) and affect the functionality of a design after it has been wholly or partially completed. ECOs can compensate for design errors found during debug or changes that are made to the design specification to compensate for design problems in other areas of the system design. In case of electronics, ECO may also be needed for replacement of electronic components due to previously used versions reaching their end of life. When improperly managed, engineering change orders can vastly increase costs. However, in some cases ECOs are done to reduce production costs in already shipping products by starting using cheaper components that became available after the initial product release.
  • 工程改变命令(英語:Engineering change orders,缩写ECO;或称工程变更命令)用于改变元件、组件,或流程、工作指令文档,并也可用于改变规格。 ECO也被称为“工程变更通知单”、工程變更通知(ECN),或简单称“工程变更”(EC)。 在典型的系统开发周期中,规范或实现可能在工程开发期间或系统元件的集成期间改变。这些在最后一分钟的设计变更通常称为工程改变命令(ECO),并影响已完全或部分完成设计的功能。ECO可以弥补在调试期间发现的设计错误,或者对设计规范做出更改以补偿其他方面的系统设计。
prov:wasDerivedFrom
page length (characters) of wiki page
is foaf:primaryTopic of
is Wikipage redirect of
is Wikipage disambiguates of
Faceted Search & Find service v1.17_git51 as of Sep 16 2020


Alternative Linked Data Documents: PivotViewer | ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3319 as of Dec 29 2020, on Linux (x86_64-centos_6-linux-glibc2.12), Single-Server Edition (61 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2021 OpenLink Software