About: Cartier Wind Energy     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRenewableEnergyCompanies, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCartier_Wind_Energy

Cartier Wind Energy (French: Cartier Énergie éolienne) is a developer, owner and operator of wind farms in Quebec. Formed in 2004 as a partnership between TransCanada Corporation (62%) and Innergex Renewable Energy (38%), the Longueuil-based company has built 5 wind farms with a combined capacity of 589.5 MW in the Gaspé peninsula delivering power under a 20-year contract signed in 2005 with Hydro-Québec. The company's sixth project, a 150-MW wind farm in Les Méchins, Quebec, was cancelled in 2010, after Cartier failed to reach an agreement with landowners.

AttributesValues
rdf:type
rdfs:label
  • Cartier Wind Energy (en)
rdfs:comment
  • Cartier Wind Energy (French: Cartier Énergie éolienne) is a developer, owner and operator of wind farms in Quebec. Formed in 2004 as a partnership between TransCanada Corporation (62%) and Innergex Renewable Energy (38%), the Longueuil-based company has built 5 wind farms with a combined capacity of 589.5 MW in the Gaspé peninsula delivering power under a 20-year contract signed in 2005 with Hydro-Québec. The company's sixth project, a 150-MW wind farm in Les Méchins, Quebec, was cancelled in 2010, after Cartier failed to reach an agreement with landowners. (en)
foaf:name
  • Cartier Wind Energy (en)
foaf:homepage
name
  • Cartier Wind Energy (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
foundation
genre
homepage
industry
  • Electric generation (en)
location city
location country
  • Canada (en)
parent
type
has abstract
  • Cartier Wind Energy (French: Cartier Énergie éolienne) is a developer, owner and operator of wind farms in Quebec. Formed in 2004 as a partnership between TransCanada Corporation (62%) and Innergex Renewable Energy (38%), the Longueuil-based company has built 5 wind farms with a combined capacity of 589.5 MW in the Gaspé peninsula delivering power under a 20-year contract signed in 2005 with Hydro-Québec. The company's sixth project, a 150-MW wind farm in Les Méchins, Quebec, was cancelled in 2010, after Cartier failed to reach an agreement with landowners. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
founding year
genre
parent company
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is owner of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software